Not Thursday the 12th, but finally we have Granite
The granite workers arrived this a.m. at 8:45 and finished the job about 1:00 p.m. The job was a week later than we’d thought but they were fast and efficient.
We have new granite counters in the kitchen and guest bathroom. It looks very nice. We didn’t pay for super large pieces of granite, so we have three seams, but it is still very nice. We’re pleased with the results. Much nicer than the white formica.
The installers put the granite in, but the plumbing is up to us. John has said he can do it, but it has turned into a bigger job than he thought. The kitchen sink has to have the “drain” lowered because the undermounted sink takes up space below the sink area which means the drain starts closer to the floor. John will have to revise the PVC piping.
In the bathroom, it’s the opposite situation. The vessel sink sits on the counter so the water lines and drain have to go higher.
The vessel sink is the prettiest I’ve ever seen.
The new rubbed bronze oval mirror will arrive tomorrow and the four contemporary rubbed bronze lights about next Tuesday.
It’ll all look grand when it’s finished, but it will take a lot of effort. I’d like to have John call in a plumber. It would be a small job for a professional with the proper tools, but for John, it’ll be a several day challenge.
Hopefully I can post photos in about a week (or maybe two). As long as it’s ready for the Christmas Eve crowd, I’ll be satisfied.