Granite Installation

Our granite counters were installed yesterday in the kitchen and guest bath. Looks good but there’s lots to be completed. Love the new faucets. The vessel sink in the bath and under-mounted kitchen sink are both nicer than I imagined. (Prettiest vessel sink I’ve ever seen!)

With no water hooked up in the kitchen or bath, it was a pain to rinse the dishes in the master bathroom, but it was only for one day. Tonight John got the kitchen drain and water working!

Our new guest bath mirror arrived, but before we can hang it, we need to patch screw holes and paint behind where the old one was located. The different lights may require wall repair. Since the light fixture won’t arrive until Tuesday, there’s only so much we can do. It’ll be great when it’s finished but we aren’t there yet.

When these things are complete, we still need to do the tile back-splash in the kitchen. That may wait until after Christmas. We’ll see.

Comments off

Not Thursday the 12th, but finally we have Granite

The granite workers arrived this a.m. at 8:45 and finished the job about 1:00 p.m. The job was a week later than we’d thought but they were fast and efficient.

We have new granite counters in the kitchen and guest bathroom. It looks very nice. We didn’t pay for super large pieces of granite, so we have three seams, but it is still very nice. We’re pleased with the results. Much nicer than the white formica.

The installers put the granite in, but the plumbing is up to us. John has said he can do it, but it has turned into a bigger job than he thought. The kitchen sink has to have the “drain” lowered because the undermounted sink takes up space below the sink area which means the drain starts closer to the floor. John will have to revise the PVC piping.

In the bathroom, it’s the opposite situation. The vessel sink sits on the counter so the water lines and drain have to go higher.

The vessel sink is the prettiest I’ve ever seen.

The new rubbed bronze oval mirror will arrive tomorrow and the four contemporary rubbed bronze lights about next Tuesday.

It’ll all look grand when it’s finished, but it will take a lot of effort. I’d like to have John call in a plumber. It would be a small job for a professional with the proper tools, but for John, it’ll be a several day challenge.

Hopefully I can post photos in about a week (or maybe two). As long as it’s ready for the Christmas Eve crowd, I’ll be satisfied.

Comments off

Our kitchen and bath enhancements to be installed Thursday!

It’ll be nice to have our kitchen and guest bath done! After that’s finished, I’d like to concentrate on the “office area” so we can have extra storage added.

To get it right, I’d be happy to pull out the cabinets John installed and start over, but maybe we can work around them. The desk that is currently there is a joke because it will never be used as a desk. It just has a pile of stuff on it. The only flat surface we need is a place to put my printer and set the router and modem for our wi-fi. What we need is a big pantry and closet space for the vacuums, mops, etc.

===========

Thursday came and went. No granite yet and no set date for the install.

We cleared Thursday and Friday of this week but those days have passed. Next week we are busy ALL WEEK until Friday.

When they finally call us, we’ll have to tell them Friday (the 20th) has to be the day. We can’t miss Elvis party (Monday); doctor appointments and Michigan Club party (Tuesday); ticket buying, Pickers Meeting, Sportsmen’s Club Meeting (Wednesday); and RV annual Storage Club meeting (Thursday). The following week is clearer, but we would like to get it done!

Seems like this business figures we can just “be there.” That’s not how it works.