Tile is nearly installed
The tile folks are ahead of schedule. It was supposed to take until the first week of December, but I know they will be starting a huge project after Thanksgiving, so they are anxioous to finish us up.
At least part of the crew (Billy) will work all weekend (continuously) to finish things up. We are happy thus far. The main body of the condo looks really nice. The lanai tile has been laid and looks better than we expected (but also busier). It’ll take some getting used to the bold tiles. The master shower stall has been stripped bare in preparation for tile. Hopefully it’ll all be done soon.
Tomorrow (Saturday) the plumbing contractor arrives to make the construction of the shower stall possible by doing the piping and stuff assigned to the plumber. It looks like Tuesday or Wednesday, they’ll finish everything.
The crew has spent long hours so they have earned the “sooner than expected” completion.
I’ll soon post the before/after photos. We’re satisfied.