Progress is being made
Our tiling project is coming right along. Today is the fourth day of our humungus mess, but the main part of the condo should be back in order tomorrow morning.
Tomorrow, Friday, after the main part is complete, the second phase of the project will begin. They will rip up the carpet toward our master bathroom, our closet carpet, the vinyl in that bathroom, and pull out the fiberglass shower stall.
The crew is working on Saturday and on that day they will install the floor tile in the bedroom hall, master closet, and master bath. The renovated master shower will be started. For 24 hours, we will be unable to get into the master bedroom so we’ll move to the guest room.
Monday the plumber will come to take care of the installation of the shower.
The hope is that they’ll finish our whole project (the living area of our condo) and our friends’, Richard and Shelly’s lanai before Thanksgiving (next Thursday). Friday and Saturday after the holiday, they’d come back to do our lanai with a slate-like porcelain.
Everything should be finished by the 26th.
We are anxious for life to get back to normal.
Obviously as things are put back in place, it’ll be a good time to really clean and soon after that, I’ll want to start our Christmas decorating.
We will still need to revamp our master bath vanity and the shower curtain problem hasn’t been solved, but it will all come together. I’m sure!!